Commercial, top to bottom
Udaan carries one use and one only. There are no apartments in it — the whole building is commercial space, so nothing in it is competing with anything else.
Our first purely commercial building: no apartments, and no shops at street level.
Plot no. 122A, Sector R1, Karanjade, Panvel, 410206
1st
Commercial project
100%
Commercial use
TBA
Storeys
TBA
Units
Udaan is Nesting Tree's seventh project and the first that isn't a home. A purely commercial building at Karanjade: no apartments anywhere in it, and no shops at street level either. It is still on paper — approvals and documentation are under way, and the drawings, the storey count and the unit mix will be published here as they are signed off.
0
Residential apartments
0
Ground-floor shops
TBA
Commercial units
Udaan sits in Karanjade, a fast-growing pocket of Navi Mumbai with strong road connectivity across the Mumbai–Pune corridor and the wider Navi Mumbai area — the same neighbourhood as every Nesting Tree building delivered or under way today.
View on Google MapsUdaan is commercial through and through — how it is divided up is still being drawn.
To be announced
The unit mix for Udaan has not been drawn up. There is no approved building plan yet, so there are no unit sizes, no carpet areas and no layouts to publish — and a carpet area printed before the plan is sanctioned is the one figure a buyer would hold us to. This section fills in with the real layouts, straight from the approved plan, the way every other Nesting Tree project page does.
Still needed
One thing is settled already: the ground floor carries no shops.
To be announced
No drawings have been published for Udaan, because none have been sanctioned. Rather than show another project's plans or a sketch of our own, this section stays empty until the approved set arrives — then it prints here floor by floor, ground to terrace, the same as every other project page.
Still needed
Udaan has not started on site. Approvals and documentation are the live phase, and nothing can begin until the Commencement Certificate is in hand. Here is the whole road from here to handover — no dates against it, because no schedule has been set.
Where Udaan stands today. Plans and paperwork are being worked through.
Not yet received. Nothing can start on site until it is.
Excavation and foundation, once the certificate is in hand.
The frame goes up. Storey count to be announced.
Plaster, tiling and paint through the building.
Possession and keys. No date has been set.
Seven projects in, this is the first that isn't a home. Most of Udaan is still being drawn, so here is what is actually settled — its use, its ground floor, and where it sits in the record behind it.
Udaan carries one use and one only. There are no apartments in it — the whole building is commercial space, so nothing in it is competing with anything else.
The ground floor is not given over to retail. What it does carry is being drawn now, and it will be published here once the plans are through.
Udaan means take-off. It is our seventh project and the first that isn't a home: the same builder, the same standard, a different kind of building.
To be announced
There is no amenity schedule for Udaan yet — the building is still in approvals, so nothing has been specified. Rather than borrow the list from one of our residences, this block stays empty until the real one exists. Then it prints here grouped, the same as every other project page.
Still needed
Bookings are not open and no pricing has been announced. Share your details and we'll come back to you as the approvals progress. Or call Vipin on +91 95940 79317.